{"id":1548,"date":"2009-04-06T00:00:08","date_gmt":"2009-04-06T05:00:08","guid":{"rendered":"http:\/\/www.olino.org\/us\/?p=1548"},"modified":"2009-04-01T10:16:31","modified_gmt":"2009-04-01T15:16:31","slug":"overhead-cable-free-trams","status":"publish","type":"post","link":"https:\/\/olino.org\/blog\/us\/articles\/2009\/04\/06\/overhead-cable-free-trams\/","title":{"rendered":"Overhead Cable-Free Trams"},"content":{"rendered":"<p><a href=\"http:\/\/www.olino.org\/wp-content\/uploads\/2009\/03\/primove_9txyk_69.jpg\" class=\"thickbox no_icon\"><img decoding=\"async\" loading=\"lazy\" src=\"http:\/\/www.olino.org\/wp-content\/uploads\/2009\/03\/primove_9txyk_69-100x71.jpg\" alt=\"primove_9txyk_69\" title=\"primove_9txyk_69\" width=\"100\" height=\"71\" class=\"alignright size-thumbnail wp-image-3777\" \/><\/a>Trams all over the world could soon be operating without the eyesore of overhead cables according to Bombardier, the world&#8217;s leading supplier of trams. Primove, Bombardier&#8217;s new tram system, uses induction technology for the transfer of electric power. This contact-less technology is five to six percent more efficient than other technologies in current use, says Bombardier. Amsterdam council has already shown serious interest<\/p>\n<p><!--more--><\/p>\n<h3>The First Prototype<\/h3>\n<p>Bombardier recently successfully presented its first prototype  <a href=\"http:\/\/www.bombardier.com\/en\/transportation\/sustainability\/technology\/primove-catenary-free-operation\" title=\"Transportation &gt; Sustainability &gt; Technology &gt; PRIMOVE Catenary-Free Operation\" target=\"_blank\">Primove tram<\/a> in Bautzen, in the east of Germany. The induction technology powering the tram is similar to that used in electric tooth brushes and in induction cooking, although on a much larger scale.<\/p>\n<p>The Primove system allows trams to operate in all environments without the use of overhead cables. This is particularly desirable in town centres and tourist areas.<\/p>\n<p><a href=\"http:\/\/www.olino.org\/wp-content\/uploads\/2009\/03\/bt-4086-primove_energy_flowhr.jpg\" class=\"thickbox no_icon\"><img decoding=\"async\" loading=\"lazy\" src=\"http:\/\/www.olino.org\/wp-content\/uploads\/2009\/03\/bt-4086-primove_energy_flowhr-400x265.jpg\" alt=\"Energieoverdracht via inductie\" title=\"Bombardier\" width=\"400\" height=\"265\" class=\"size-medium wp-image-3845\" \/><\/a><br \/>\n<em>Energy transfer via Induction<\/em><\/p>\n<h3>Advantages for the Transportation Company<\/h3>\n<p>Advantages of the Primove system are:<\/p>\n<ul>\n<li>Easy installation<\/li>\n<li>No overhead cables<\/li>\n<li>Immunity to weather conditions \u2013 frozen cables, etc.<\/li>\n<li>Less wear due to contact-less energy transfer<\/li>\n<li>Smaller tram tunnels, because no overhead cabling is required<\/li>\n<li>Less maintenance<\/li>\n<\/ul>\n<h3>Operation<\/h3>\n<p>In Primove trams, the overhead cable is replaced by an underground cable between the rails. The principle of operation is similar to that of transformers, the primary circuit being in the ground and the secondary circuit built into the undercarriage of the tram. The electro-magnetic field between the primary and secondary circuit generates the electricity to drive the tram. Furthermore, the primary circuit is segmented, each segment being energised only when the tram is directly above. This ensures that the system is safe and that there is no danger to pedestrians.<\/p>\n<p><a href=\"http:\/\/www.olino.org\/wp-content\/uploads\/2009\/03\/bt-4088-primove_pickup_coilshr.jpg\" class=\"thickbox no_icon\"><img decoding=\"async\" loading=\"lazy\" src=\"http:\/\/www.olino.org\/wp-content\/uploads\/2009\/03\/bt-4088-primove_pickup_coilshr-400x265.jpg\" alt=\"Spoelen aan de onderkant van de tram\" title=\"Bombardier\" width=\"400\" height=\"265\" class=\"size-medium wp-image-3846\" \/><\/a><br \/>\n<em>Pick-up Coils<\/em><\/p>\n<h3>Energy saving<\/h3>\n<p>The Primove tram is fitted with an integrated <a href=\"http:\/\/www.olino.org\/wp-content\/uploads\/2009\/03\/bt-eco4-mitrac_energy_saver.pdf\" title=\"MITRAC energy saving system\">MITRAC energy saving system<\/a> installed on its roof. This system consists of capacitors which store energy when the tram brakes and allows this energy to be used for acceleration. Tests conducted on a \u201clight-rail\u201d system in Mannheim since 2003 have shown that up to thirty percent less energy is required, greatly reducing costs and emission levels.<\/p>\n<p><a href=\"http:\/\/www.olino.org\/wp-content\/uploads\/2009\/03\/bt-4087-primove_energy_saverhr.jpg\" class=\"thickbox no_icon\"><img decoding=\"async\" loading=\"lazy\" src=\"http:\/\/www.olino.org\/wp-content\/uploads\/2009\/03\/bt-4087-primove_energy_saverhr-400x265.jpg\" alt=\"Het MITRAC systeem bovenop de tram\" title=\"Bombardier\" width=\"400\" height=\"265\" class=\"size-medium wp-image-3847\" \/><\/a><br \/>\n<em>The Mitrac system on top of the tram<\/em><\/p>\n<p>Initial purchase and installation costs of Primove, to replace existing trams, can be up to thirty percent more expensive than conventional alternatives. However according to Dr. Carsten Struve, director of Advanced Technology Development at Bombardier Transportation, the savings in energy and maintenance costs enable the investment to be recovered within six to ten years.<\/p>\n<h3>The Future <\/h3>\n<p>The first Primove trams are to be delivered in 2010. Induction systems for metro&#8217;s and trains are also on the drawing boards and should become available within five to ten years. Even safe and reliable induction systems for high speed trains are possible, says Dr. Carsten Struve. Bombardier also has plans for wireless trolley buses and possibly in the future an induction system for powering cars. Bombardier&#8217;s biggest competitors, Siemens, the manufacturer of the Amsterdam Combinotram, and the French Alsthom company also have induction systems in the planning.<\/p>\n<h3>Induction Powered Cars?<\/h3>\n<p>It sounds marvelous, an electric car that charges up its batteries while traveling, but what are the practical problems? With a tram, the power cable is positioned between the rails: but how could this be done on a public highway with many lanes? Placing a cable in the middle of each lane would be a huge installation undertaking, require an enormous amount of copper cable, and present considerable safety problems.<\/p>\n<p><a href=\"http:\/\/www.olino.org\/wp-content\/uploads\/2009\/03\/bt-4095-energy_saverhr.jpg\" class=\"thickbox no_icon\"><img decoding=\"async\" loading=\"lazy\" src=\"http:\/\/www.olino.org\/wp-content\/uploads\/2009\/03\/bt-4095-energy_saverhr-400x266.jpg\" alt=\"Het MITRAC energieopslag systeem\" title=\"BOMBARDIER \/ Energy Saver \/ Mannheim 2008\" width=\"400\" height=\"266\" class=\"size-medium wp-image-3856\" \/><\/a><br \/>\n<em>MITRAC Energy Storage System with Capacitors<\/em><\/p>\n<p>A possible solution is to lay a cable alongside the highway which criss-crosses the highway every 500 metres or so. Vehicles passing over the cable would charge up a capacitor based storage unit capable of propelling the vehicle to the next cable, and charge up the vehicle&#8217;s batteries. The final part of a journey would be made on the batteries, thus cables need only be installed under main roads and highways. Such a system would minimize installation and safety problems and require far less copper cable. A payment system for the electricity would have to be agreed. <\/p>\n<p>Any suggestions and comments about this solution are welcome.<\/p>\n<h3>Sources<\/h3>\n<ul>\n<li><a href=\"http:\/\/www.parool.nl\/parool\/nl\/4\/AMSTERDAM\/article\/detail\/131641\/2009\/01\/22\/Draadloze-tram-verlost-steden-van-bovenleidingen.dhtml\" title=\"PAROOL: AMSTERDAM - Geen draadje meer boven de tram\" target=\"_blank\">Article in Dutch newspaper &#8220;No more wire above the tram&#8221;<\/a> (Parool.nl)<\/li>\n<li><a href=\"http:\/\/www.bombardier.com\/\" title=\"Bombardier Inc. - Bombardier - Home\" target=\"_blank\">Manufacturer Bombardier<\/a><\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Trams all over the world could soon be operating without the eyesore of overhead cables according to Bombardier, the world&#8217;s leading supplier of trams. Primove, Bombardier&#8217;s new tram system, uses induction technology for the transfer of electric power. This contact-less technology is five to six percent more efficient than other technologies in current use, says [&hellip;]<\/p>\n","protected":false},"author":14,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[11],"tags":[],"_links":{"self":[{"href":"https:\/\/olino.org\/blog\/us\/wp-json\/wp\/v2\/posts\/1548"}],"collection":[{"href":"https:\/\/olino.org\/blog\/us\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/olino.org\/blog\/us\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/olino.org\/blog\/us\/wp-json\/wp\/v2\/users\/14"}],"replies":[{"embeddable":true,"href":"https:\/\/olino.org\/blog\/us\/wp-json\/wp\/v2\/comments?post=1548"}],"version-history":[{"count":7,"href":"https:\/\/olino.org\/blog\/us\/wp-json\/wp\/v2\/posts\/1548\/revisions"}],"predecessor-version":[{"id":1551,"href":"https:\/\/olino.org\/blog\/us\/wp-json\/wp\/v2\/posts\/1548\/revisions\/1551"}],"wp:attachment":[{"href":"https:\/\/olino.org\/blog\/us\/wp-json\/wp\/v2\/media?parent=1548"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/olino.org\/blog\/us\/wp-json\/wp\/v2\/categories?post=1548"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/olino.org\/blog\/us\/wp-json\/wp\/v2\/tags?post=1548"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}