{"id":2721,"date":"2009-07-27T00:00:43","date_gmt":"2009-07-27T05:00:43","guid":{"rendered":"http:\/\/www.olino.org\/us\/?p=2721"},"modified":"2009-07-06T16:28:44","modified_gmt":"2009-07-06T21:28:44","slug":"my-solar-panel-system-of-2940-wp","status":"publish","type":"post","link":"https:\/\/olino.org\/blog\/us\/articles\/2009\/07\/27\/my-solar-panel-system-of-2940-wp\/","title":{"rendered":"My Solar Panel System of 2940 Wp"},"content":{"rendered":"<p><a href=\"http:\/\/www.olino.org\/wp-content\/uploads\/2009\/06\/20090430-zonnepanelen_.png\" class=\"thickbox no_icon\"><img decoding=\"async\" loading=\"lazy\" src=\"http:\/\/www.olino.org\/wp-content\/uploads\/2009\/06\/20090430-zonnepanelen_-100x76.png\" alt=\"20090430-zonnepanelen_\" title=\"20090430-zonnepanelen_\" width=\"100\" height=\"76\" class=\"alignright size-thumbnail wp-image-5967\" \/><\/a>On April 29&#8217;th 2009, finally my solar panels are installed! 14 panels of 210 Wp (Watt Peak) each (<a href=\"http:\/\/www.olino.org\/wp-content\/uploads\/2009\/06\/stp200_18ub_n0102_mar9_2009.pdf\" title=\"Suntech STP210-18\/Ub\">Suntech STP210-18\/Ub<\/a>). In total 2940 Wp (Watt Peak). Not a small one. Especially if I tell you that my last year\u2019s usage in electricity has been around 1600 kWh. That\u2019s why I bought it also for the future. If I had an addition to the family, and an electric car! My choices: Hybrid plug-in, or pure electrical, depending on what models will be available. But I will write an article about that some other time. Now more about this installation\u2026<\/p>\n<p><!--more--><\/p>\n<p>The roof has a slope of about 35\u00b0, and is pointed south-south-west (approximately 220\u00b0). 15 panels just didn\u2019t fit because of the outlet pipe of the heating, and a bigger inverter would be needed. That\u2019s why it is 14. But in the future I can still use the lower part of the roof.<\/p>\n<h3>Subsidy<\/h3>\n<p>More than a year ago I took the first step in obtaining a pv-installation. The most (waiting) time took the subsidy settlement of <a href=\"http:\/\/www.senternovem.nl\/english\/\" title=\"SenterNovem - SenterNovem English\">SenterNovem<\/a>. Keep in mind that this is the settlement of 2008. The new one in 2009 is a bit better. You need to fill in the form digitally, and it will be validated immediately. The costs for the <a href=\"http:\/\/www.certiq.nl\/english\/\" title=\"CertiQ - Homepage\">CertiQ<\/a> subscription will be compensated for, even with retroactive effect for 2008! But it remains a lot of bureaucratic paperwork. So you have to go through it all to get it done. Finally I have a subsidy arrangement for the amount of 2000 Wp. That means, until now I haven\u2019t gotten any money yet, but the last papers are on its way. The 2000 Wp is the power I requested originally, not knowing the installation would be much bigger in the end. But during the request period you can not change it anymore. That is the \u201cStimulating\u201d effect of the SDE (Dutch subsidy on renewable power generation). So far, it has only slowed me down. I arranged the subsidy settlement myself, but for the expansion of the meter cupboard, and the installation of the panels I hired a company (<a href=\"http:\/\/www.vls-energie.nl\/\" title=\"Energie Techniek\">VLS-Energie<\/a>). From that I only have to bargain once. After that, someone from <a href=\"http:\/\/www.enexis.nl\/\" title=\"Enexis &gt; Homepage Enexis\">Enexis<\/a> installed the new electricity meters.<\/p>\n<h3>The Electricity Meters<\/h3>\n<p>The picture on the left shows the old meter in the meter cupboard, on the right you see the 2 new digital ones. <a href=\"http:\/\/www.olino.org\/wp-content\/uploads\/2009\/06\/meterkast-voorheen_.png\" class=\"thickbox no_icon\"><img decoding=\"async\" loading=\"lazy\" src=\"http:\/\/www.olino.org\/wp-content\/uploads\/2009\/06\/meterkast-voorheen_-157x400.png\" alt=\"Old meter in cupboard\" title=\"Old meter in cupboard\" width=\"157\" height=\"400\" class=\"alignleft size-medium wp-image-5966\" \/><\/a><a href=\"http:\/\/www.olino.org\/wp-content\/uploads\/2009\/06\/meterkast-na-aanpassing_.png\" class=\"thickbox no_icon\"><img decoding=\"async\" loading=\"lazy\" src=\"http:\/\/www.olino.org\/wp-content\/uploads\/2009\/06\/meterkast-na-aanpassing_-156x400.png\" alt=\"new digital meters\" title=\"new digital meters\" width=\"156\" height=\"400\" class=\"alignright size-medium wp-image-5968\" \/><\/a> Personally I like the old meter, because it&#8217;s very satisfying to read it. From the speed of it you can see very nicely how much juice is consumed or produced. On the digital meter, only a small LED blinks once in a while and a small arrow is displayed. When you look at the new meters, the left one is the Gross production meter (necessary for the subsidy), and the right one is the main meter. They are identical and both have 4 counters. 2 for using electricity, low and high tariff, and 2 for delivering electricity back to the net. In the Gross production meter only 1 counter is used.<\/p>\n<h3>The inverter<\/h3>\n<p>As you can see, I already had an empty pvc-tube which ends up on the attic. So it was only a matter of getting the wires through it, and connect them. On the next picture you can see the inverter.<a href=\"http:\/\/www.olino.org\/wp-content\/uploads\/2009\/06\/omvormer.png\" class=\"thickbox no_icon\"><img decoding=\"async\" loading=\"lazy\" src=\"http:\/\/www.olino.org\/wp-content\/uploads\/2009\/06\/omvormer-210x400.png\" alt=\"Mastervolt Sunmaster XS3200 Inverter\" title=\"Mastervolt Sunmaster XS3200 Inverter\" width=\"210\" height=\"400\" class=\"alignright size-medium wp-image-5964\" \/><\/a> It is the Mastervolt <a href=\"http:\/\/www.olino.org\/us\/wp-content\/uploads\/2009\/07\/manualxs4300_3200_2000_081105en.pdf\" title=\"Mastervolt Sunmaster XS3200\">Sunmaster XS3200<\/a>. It has an integrated display on which you can read the most important values. I use the grey cable (<a href=\"http:\/\/en.wikipedia.org\/wiki\/RS-485\" title=\"EIA-485 - Wikipedia, the free encyclopedia\">RS-485<\/a>) on the right, to read the data of the last 30 days with a small laptop and create graphics of them on the computer. I don\u2019t use the standard software from Mastervolt, because it falls short badly. I unravelled the communication protocol, and wrote a small program myself. Inside of the inverter there is a fan, which will run faster in proportion with the produced power. Not suitable to install in a bedroom, unless you like to be awakened up by the \u201csound of the sun\u201d every morning ;-). Below the inverter there is an extra switch to cut the power. Despite the fact that the inverter will switch of automatically when there is a power cut, it is mandatory. At the bottom of the inverter there is another switch to disconnect the solar panels. These are connected with the red and black connectors in the middle. It all works automatically, so you don\u2019t have to do anything. At night it will switch of automatically, and when there is sufficient light, it will switch on again.<\/p>\n<h3>Energy Supplier<\/h3>\n<p>In march I changed from energy supplier and went to <a href=\"http:\/\/www.greenchoice.nl\/\" title=\"Greenchoice\">GreenChoice<\/a>. Compared to other suppliers, this one has a number of advantages, and in most cases it is even cheaper too! Look, I am not involved in this company or whatever, but I don\u2019t see why you shouldn\u2019t change to it. Only advantages, and you get real clean power. Or you deliver it yourself when the sun shines \u263a.<\/p>\n<h3>The results<\/h3>\n<p>All in all I\u2019m really satisfied with my pv-installation. In the month of May, I had a profit of 384 kWh, and June was even a tiny bit better. My expectation for this year is a profit of approximately 2500 kWh. So, until I own an electric car, I will definitely be a producer of power. I am already looking forward to this year\u2019s final bill of my supplier, or in my case \u201cclient\u201d ;-).<\/p>\n","protected":false},"excerpt":{"rendered":"<p>On April 29&#8217;th 2009, finally my solar panels are installed! 14 panels of 210 Wp (Watt Peak) each (Suntech STP210-18\/Ub). In total 2940 Wp (Watt Peak). Not a small one. Especially if I tell you that my last year\u2019s usage in electricity has been around 1600 kWh. That\u2019s why I bought it also for the [&hellip;]<\/p>\n","protected":false},"author":22,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[15],"tags":[],"_links":{"self":[{"href":"https:\/\/olino.org\/blog\/us\/wp-json\/wp\/v2\/posts\/2721"}],"collection":[{"href":"https:\/\/olino.org\/blog\/us\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/olino.org\/blog\/us\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/olino.org\/blog\/us\/wp-json\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/olino.org\/blog\/us\/wp-json\/wp\/v2\/comments?post=2721"}],"version-history":[{"count":13,"href":"https:\/\/olino.org\/blog\/us\/wp-json\/wp\/v2\/posts\/2721\/revisions"}],"predecessor-version":[{"id":2728,"href":"https:\/\/olino.org\/blog\/us\/wp-json\/wp\/v2\/posts\/2721\/revisions\/2728"}],"wp:attachment":[{"href":"https:\/\/olino.org\/blog\/us\/wp-json\/wp\/v2\/media?parent=2721"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/olino.org\/blog\/us\/wp-json\/wp\/v2\/categories?post=2721"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/olino.org\/blog\/us\/wp-json\/wp\/v2\/tags?post=2721"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}